TEEL was contracted by EDENS to lead the 2nd phase of development at the Shops at Stonefield.
A pair of single-story base buildings were constructed to a cold dark shell condition totaling approximately 21,600 s.f. TEEL subsequently prepared the shells for the incoming retail and restaurant tenants to vanilla box condition. 2015 ICSC U.S. Design and Development Commendation.